pdf Perez2000 Popular

By 2085 downloads

IMPROVEMENTS TO PWR REACTOR VESSEL INSPECTION EQUIPMENT AND THEIR INFLUENCE ON REDUCTION OF THE DOSE ASSOCIATED WITH SUCH WORK
By A. Perez, Vandellos II NPP / F. Gonzalez, F. Novalvos, J. Serrano, A. Wilke, Tecnatom / Spain